天堂网在线最新版www中文网,国产精品熟女视频一区二区,97碰碰碰人妻视频无码,国产乱子影视频上线免费观看,久久国产福利播放

FAT

The four days sea trial for MV GUANG ZHOU WAN was completed on Mar.23,2017

Share to:

The four days sea trial for MV GUANG ZHOU WAN was completed on Mar.23,2017.

The 13,000DWT Pitched Carrier AH0002AL was built by Qingdao Wuchuang Heavy Industry Co., Ltd. for COSCO Shipping Co., Ltd.

 Shanghai NSE supplied MSB/ESB/GSP/ISP for the vessel.

 


Welcome to visit our booth atMarintec China 2017 in Shanghai from December 5th - 8th (Booth No: N3K29).