天堂网在线最新版www中文网,国产精品熟女视频一区二区,97碰碰碰人妻视频无码,国产乱子影视频上线免费观看,久久国产福利播放

FAT

The eight days sea trial for MV ADMIRAL SCHMIDT was completed on Aug. 8, 2019

Share to:

The eight days sea trial for MV ADMIRAL SCHMIDT was completed on Aug. 8, 2019.

The 108000dwt Bulk Carrier (Hull No.: S1250) built by Shanghai Shipyard Co., Ltd. for Platano Eesti OU.

Shanghai NSE supplied Main Switchboard /Emergency Switchboard /Group Starter Panel /Distribution Boards /Individual Starter Panel /Battery Charger & Discharge Panel /Test Panel /Shoer Connection Panel /Control Box for the vessel.